Contract 26934 REL 29: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
26934 REL 29
Contract Title:
2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
26934 REL 22: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
  • 26934 REL 34: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
The goal of this project is to provide temporary upstream passage for bull trout at Albeni Falls Dam, Pend Oreille River. We propose to collect bull trout below the dam using boat electrofishing. The fish will then be transported above Albeni Falls Dam and released near Priest River, Idaho, or re-released below the dam depending on water temperature and number of fish captured.  Prior to release each fish will be implanted with a combination radio-acoustic transmitter to track the fish to potential spawning tributaries of Pend Oreille Lake. A system of stationary radio receiving stations and airplane/truck/boat surveys will be used to monitor the movement of the tagged fish. This project provides direct on-the-ground benefits for endangered bull trout in the Pend Oreille Basin because it will allow fish, whose migration corridor has been blocked by a dam without fish passage, to return to their natal streams and contribute their genes (which would otherwise have been lost) to the spawning population.
Account Type(s):
Expense
Contract Start Date:
05/01/2010
Contract End Date:
04/04/2011
Current Contract Value:
$125,743
Expenditures:
$125,743

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 04/15/2011 03/25/2011
Bull trout tagged and transported upstream of Albeni Falls Dam B: 157. Electrofish, tag, and transport bull trout 10/30/2010 10/30/2010
4 boat-tracking surveys of Lake Pend Oreille C: 157. Lake tracking surveys 11/30/2010 11/30/2010
Functioning radio monitoring stations D: 157. Download and maintain stationary radio receiving stations 04/30/2011 04/04/2011
Complete all project management activities for FY10/11 E: 119. Manage Project 04/30/2011 04/04/2011
Develop a profile of each fish tracked F: 162. Data reduction and analysis 12/31/2010 12/31/2010
Final report uploaded to the BPA website G: 132. Submit Annual Report for the period May 2009 to April 2010 04/30/2011 04/04/2011
Manuscript prepared for peer-reviewed journal H: 183. Write journal article 04/30/2011 04/04/2011
Monitoring equipment removed and stored I: 70. Uninstall all radio monitoring stations 04/30/2011 03/25/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 05/01/2010
B 157 Electrofish, tag, and transport bull trout 05/01/2010
C 157 Lake tracking surveys 05/01/2010
D 157 Download and maintain stationary radio receiving stations 05/01/2010
E 119 Manage Project 05/01/2010
F 162 Data reduction and analysis 05/01/2010
G 132 Submit Annual Report for the period May 2009 to April 2010 05/01/2010
H 183 Write journal article 05/01/2010
I 70 Uninstall all radio monitoring stations 05/01/2010
J 185 Periodic Status Reports for BPA 05/01/2010